I took a "drain pipe" got it from Home Depot for 6 bucks and it was 6 ft long. I cut it into 1/3 pieces and took one of those pieces and cut it in half #long ways making it no longer a "pipe" or "tube"#. Then I drilled two holes on one side and tie wrapped it to the 2nd level. After i took my "snuggie" and cut the sleeves off and covered the ramp. Then zip tied the side that touched the wall of the cage all the way down to the 1st level. Hope that made sence. Lol. Smile